- Home
- Departments
- Public Works
Public Works
Documents, Policies, & Forms
- Town of Voluntown Snow and Ice Control Policy (PDF)
- Road Sign Request Form
- Mailbox Installation Guidelines
- Forge Hill Road Bridge Inspection Report (PDF)
- Driveway and Driveway Apron Standards (PDF)
- Driveway Permit Application Login or register for free at Permitlink. Once logged in, the application is under 'Zoning and Wetlands'. Driveway aprons that are not installed per apron standards (see above), will not be approved for bond refund until corrected.
- BETA Road Management Plan- This presentation can be viewed on the town YouTube Channel: Public Hearing 5/21/24
- MRT Road Preservation Information
Public Works News
Road Work on Shetucket Turnpike
8/26/25
Roadwork will begin on Shetucket Turnpike on Tuesday, August 27. The first part of the road project is MRT application. Felix A. Marino Co Inc has been contracted to treat Shetucket Turnpike with Reclamite, an asphalt pavement Maltene rejuvenator. Maltene Replacement Technology (MRT) extends the life of asphalt pavements and is part of the Town's road preservation plan. One lane will always be open for thru traffic. Sand is applied to the road after the MRT application and will be removed in a week or so. Speed limit will be reduced to 15mph due to the sand. In about two weeks, crack sealing will start.
CTDOT is Developing Plants to Replace Speed Limit Signs on Local Rural Roads Throughout Connecticut
7/9/25
The Connecticut Department of Transportation (CTDOT) is developing plans to replace municipally owned and maintained post-mounted sheet aluminum speed limit signs on municipally owned rural roads. All existing speed limit signs along roadways included in this project will be replaced with new, retroreflective signs to ensure proper placement and compliance with current federal guidelines.
The fatality rate on these types of roads has increased over the past 2 years. Additionally, from 2020 to 2021, 19% of all crashes were speeding related. As such, one of the State's safety initiatives is to replace speed limit signs on higher-risk rural roads to increase visibility, ensure compliance with standards, and assist with enforcement efforts. CTDOT will coordinate with the towns during the design phase. The design plans for this project are expected to be completed in October 2025 with a tentative advertising date for construction of December 2025.
It is CTDOT's policy to keep the public informed and involved when such projects are undertaken and important that the community share its concerns with us to assist in the project's development. Anyone interested in requesting information on these projects may do so by contacting Balazs Szoke, Project Manager at (860) 594-2745 or via email at Balazs.Szoke@ct.gov. Please refer to Project 0170-3756.
Roads being done in Voluntown:
Brown Road, Congdon Road, Church Street
Forge Hill Bridge Open As One Lane Bridge Until Further Notice
The Forge Hill Bridge Is Now Open as a One Lane Bridge. Please Note That the Traffic Pattern Has Been Changed at the Wylie School Rd/Forge Hill Rd/ North Shore Road Intersection. It Is No Longer a 2 Way Stop, but Is Now a Three Way Stop So Drivers Can Prepare Safely for the Lane Bridge. Please Proceed Accordingly.
-
Safety or Maintenance Concerns
- Call the Selectmen’s Office at 860-376-5880. Please leave a message if office is closed- messages are checked.
- Email Tracey Hanson or email Julie Zelinsky
Report a Hazard in the Roadway
- If a hazard is blocking traffic and/or is life threatening, dial 9-1-1 to report it. Dispatch notifies Public Works and/or the fire department and/or Eversource.
- Call the Selectmen’s Office 860-376-5880
All roads in the town are maintained by The Department of Public Works with the exception of State Roads routes 49, 138, 165, which are maintained by CT DOT Occum Office at 860-823-3204.